001 | 2019006252 456872 | |
003 | IlJaBTS | |
005 | 20200604094446.0 | |
008 | 200506s2020 mnuao b b 001 0 eng | |
010 | a| 2019006252 | |
020 | a|9781681518336 (lib. ed.) | |
020 | a|1681518333 (lib. ed.) | |
020 | a|9781681525617 (pbk.) | |
020 | a|1681525615 (pbk.) | |
040 | a|DLC b|eng c|IlJaBTS d|IlJaBTS | |
050 | a|TN871.3 b|.H65 2020 | |
082 | 4 | a|665 2|2020 |
100 | 1 | a|Holdren, Annie C. c|(Annie Cody) |
245 | 1 | a|Building an offshore oil rig / c|by Annie C. Holdren. |
260 | a|Mankato, MN : b|Amicus/Amicus Ink, c|c2020. | |
300 | a|32 p. : b|col. ill. ; c|25 cm | |
490 | 1 | a|Amazing structures |
504 | a|Includes bibliographical references and index. | |
520 | a|Follow the sequence of the process taken to build an offshore oil rig, from the proposal and planning to the actual construction of the rig. | |
521 | 1 | a|007-010. b|BTSB. |
521 | 8 | a|550 b|Lexile. |
526 | a|Accelerated Reader b|LG c|4.2 d|0.5 z|506033. | |
650 | 7 | a|Drilling platforms x|Design and construction. 2|sears |
650 | 7 | a|Petroleum industry and trade. 2|sears |
650 | 7 | a|Civil engineering. 2|sears |
650 | 1 | a|Drilling platforms x|Design and construction. |
650 | 1 | a|Petroleum industry and trade. |
650 | 1 | a|Civil engineering. |
655 | 1 | a|Engineering. |
655 | 1 | a|Technology. |
655 | 7 | c|JNF051120 a|NONFICTION / Technology / How Things Work-Are Made. 2|bisacsh |
830 | a|Amazing structures (Amicus (Firm : Mankato, Minn.)) |
Loading...