Bound To Stay Bound

View Book Details

001 2019006252 456872
003IlJaBTS
00520200604094446.0
008200506s2020 mnuao b b 001 0 eng
010 a| 2019006252
020 a|9781681518336 (lib. ed.)
020 a|1681518333 (lib. ed.)
020 a|9781681525617 (pbk.)
020 a|1681525615 (pbk.)
040 a|DLC
b|eng
c|IlJaBTS
d|IlJaBTS
050  a|TN871.3
b|.H65 2020
082 4a|665
2|2020
1001 a|Holdren, Annie C.
c|(Annie Cody)
245a|Building an offshore oil rig /
c|by Annie C. Holdren.
260 a|Mankato, MN :
b|Amicus/Amicus Ink,
c|c2020.
300 a|32 p. :
b|col. ill. ;
c|25 cm
4901 a|Amazing structures
504 a|Includes bibliographical references and index.
520 a|Follow the sequence of the process taken to build an offshore oil rig, from the proposal and planning to the actual construction of the rig.
5211 a|007-010.
b|BTSB.
5218 a|550
b|Lexile.
526  a|Accelerated Reader
b|LG
c|4.2
d|0.5
z|506033.
650 7a|Drilling platforms
x|Design and construction.
2|sears
650 7a|Petroleum industry and trade.
2|sears
650 7a|Civil engineering.
2|sears
650 1a|Drilling platforms
x|Design and construction.
650 1a|Petroleum industry and trade.
650 1a|Civil engineering.
655 1a|Engineering.
655 1a|Technology.
655 7c|JNF051120
a|NONFICTION / Technology / How Things Work-Are Made.
2|bisacsh
830  a|Amazing structures (Amicus (Firm : Mankato, Minn.))


View Book Details
Loading...