Bound To Stay Bound

View Book Details

001 2017930243 184402
003IlJaBTS
00520190102081229.0
008170615s2018 mnuao c b 001 0 eng
010 a| 2017930243
020 a|9781532111686 (lib. ed.)
020 a|1532111681 (lib. ed.)
040 a|DLC
c|IlJaBTS
d|IlJaBTS
082 4a|625.42
2|23
1001 a|McCarthy, Cecilia Pinto.
245a|Engineering the NYC subway system /
c|Cecilia Pinto McCarthy.
2463 a|Engineering the New York City subway system
260 a|Minneapolis :
b|Abdo,
c|c2018.
300 a|48 p. :
b|ill. (chiefly col.) ;
c|23 cm
4901 a|Building by design
500 a|Includes glossary.
504 a|Includes bibliographical references and index.
5104 a|Horn book guide,
c|vol. XXIX, no. 1, Spring 2018, p. 211
520 a|An introduction to the NYC Subway System, including how designers drew up plans for the subway, how workers built the underground system in one of the world's busiest cities, how commuters still rely on its hundreds of trains today, and more.
5211 a|009-012.
b|BTSB.
5218 a|840
b|Lexile.
5218 a|X.
b|Fountas and Pinnell Leveled Book.
526  a|Accelerated Reader
b|MG
c|5.5
d|1.0
z|191141.
650 7a|Subways.
2|sears
650 1a|Subways.
651 7a|New York (N.Y.)
x|History.
2|sears
651 1a|New York (N.Y.)
x|History.
830  a|Building by design (Core Library (Firm))


View Book Details
Loading...